ICLL 1966 PDF

The International Convention on Load Lines (CLL), was signed in London on 5 April , amended by the Protocol and further revised in LL69 Interpretation to ICLL Reg. Rev.1 July LL70 Corrosion Margin for Hatch Cover Design. Jan LL71 Similar Stage of. Rev.1 Nov LL Position of freeboard deck on float on/float off barge carriers. (Regulation 3(9)). Rev.1 July LL Interpretation to ICLL Reg.

Author: Tygotaxe Gardagis
Country: Belize
Language: English (Spanish)
Genre: Video
Published (Last): 22 January 2014
Pages: 17
PDF File Size: 7.16 Mb
ePub File Size: 3.54 Mb
ISBN: 678-6-25574-170-2
Downloads: 60955
Price: Free* [*Free Regsitration Required]
Uploader: Kazragore

International Convention on Load Lines 1966 (ICLL 1966)

The provisions of Regulation 15 5 are applicable for ships of not more than metres feet in length. Upon exposed superstructure decks situated abaft a quarter of the ship’s length from the forward perpendicular and located at least one standard height of superstructure above the freeboard deck. When a lower deck is designated as the freeboard deck, that part of the hull which 1696 above the freeboard deck is treated as a superstructure so far as concerns the application of the conditions of assignment and the calculation of freeboard.

Permanente link Article 31 Suspension Ingangsdatum: Other openings in such casings shall be fitted with equivalent covers, permanently attached in their proper positions. Such certificate shall be subject to a renewal, endorsement and cancellation procedure similar to that provided for an International Load Line Certificate under this Article.

The survey shall be such as to ensure that the arrangements, materials and scantlings fully comply with the requirements of the present Convention. Amidships is at the middle of the length L.

International Convention on Load Lines

The northern boundary of the area is the southern boundary of the Tropical Zone. The maximum curvature which may be taken into account in determining this increase is one-half the breadth of the superstructure at the point of intersection of the curved end of the superstructure with its side.

Standard height in m L m Raised quarterdeck All other superstructures 30 or less 0. Tarpaulins 12 At least two layers of tarpaulin in good condition shall be provided for each hatchway in position 1 or 2.

Permanente link Permanente link Article 17 Issue of Certificate by another Government 1 A Contracting Government may, at the request of another Contracting Government, cause a ship to be surveyed and, if satisfied that the provisions of the present Convention are complied with, shall issue or authorize the issue of an International Load Line Certificate to the ship in accordance with the present Convention.

  MALKAVIANER CLANBUCH PDF

Position 1 – Upon exposed freeboard and raised quarter decks, and upon exposed superstructure decks situated forward of a point located a quarter of the ship’s length from the forward perpendicular.

International Convention on Load Lines – Wikipedia

Additional freeboard may be required as determined by the Administration. Satisfactory means permanently attached, shall be provided for closing the openings of the air pipes.

Article 09 Approvals for Experimental Purposes Ingangsdatum: Unless expressly provided otherwise, the breadth B is the maximum breadth of the ship, measured amidships to the moulded line of the frame in a ship with a metal shell and to the outer surface of the hull in a ship with a shell of any other material.

This page was last edited on 12 Novemberat Article 22 Privileges Ingangsdatum: Where the height exceeds the standard, no increase shall be made to the effective length of the superstructure. In these special circumstances, the new certificate shall be valid to a date not exceeding 5 years from the date of completion of the renewal survey.

These lines shall be horizontal lines mm in length and 25 mm in breadth which extend abaft unless expressly provided otherwise, and are at right angles to, a vertical line 25 mm in breadth marked at a distance mm abaft the centre of the ring as illustrated in figure 6.

An existing ship in such a case shall not, as a rule, comply to a lesser extent with the requirements for a new ship than it did before. Permanente link Article 26 Communication of Information Ingangsdatum: Any such ship shall, however, comply with safety requirements, which, in the opinion of that Administration, are adequate for the service for which it is intended and are such as to ensure the overall safety of the ship and which are acceptable to the Governments of the States to be visited by the ship.

Permanente link Permanente link Article 18 Form of Certificates 1 The certificates shall be drawn up in the official language or languages of the issuing country. Doorways in ic,l deckhouses or companionways shall be fitted with doors complying with the requirements of Regulation 12 1. Permanente link Article 07 Force Majeure Ingangsdatum: Permanente link Article 16 Issue of Certificates icol An International Load Line Certificate shall be issued to every ship which has been surveyed and marked in accordance with the present Convention.

Organizations, including classification societies, referred to in article 13 of the Convention and regulation 1 2 shall comply with the guidelines adopted by the Organization by resolution A.

  HESTON BLUMENTHAL IN SEARCH OF PERFECTION PDF

Wedges shall be of tough wood or other equivalent material. Distinctive number or letters. Usually, the date from adoption to deemed acceptance is two years. The result of this calculation, the Freeboard mark, is permanently marked on the ship hull. If necessary the ship shall be re-inclined.

Permanente link Permanente link Article 22 Privileges Ingangsdatum: Views Read Edit View history. In the Load Lines convention, adopted by IMO, provisions are made for determining the freeboard of ships by subdivision and damage stability calculations. Lashings 6 Timber deck cargo shall be efficiently secured throughout its length by independent over-all lashings spaced not more than 3 metres 9. Annexes to the Convention contain various regulations for determining load lines, including details of marking and verification of marks, conditions of assignment of freeboard, freeboard tables and corrections, special provisions for ships intended for the carriage of timber and the prescribed form of International Load Line Certificates.

International Load Line Certificate Official seal Issued under the provisions of the International Convention on Load Line s lcll,under the authority of the Government of full official designation of the country iicll official designation of the competent person or organization by recognized under the provisions of the International Convention on Load Line sName of ship Distinctive number or letters Port of kcll Length L as defined in Article 2 8.

Mild steel plating forming the tops of covers shall be not be less in thickness than one per cent of the spacing 11966 stiffeners or 6 millimetres 0. Where these heights may interfere with the working of the ship, a lower jcll may be approved, provided the Administration is satisfied that the closing arrangements and other circumstances justify a lower height.

Date of issue Signature of official issuing the certificate. Permanente link Permanente link Reg. Steering arrangements 12 Steering arrangements shall be effectively protected from damage by cargo and, as far as practicable, shall be accessible.

They shall also be permanently marked on the sides of the ships to the satisfaction of the Administration. Overzicht van meest recent bekeken documenten. Article 27 SignatureAcceptance and Accession Ingangsdatum: